PROJECT/RECORD:
In the different phases of the setting up of a wind farm (design, contruction and assembly, starting and explotation) it is necessary the coordination between the great variety of enterprises (technologists, engeneering, fitters) in order to get a correct operation of the power station. In Sotavento, this diversity is emphasized by the presence of five different wind technologies with different systems of electric production. In consequence, Sotavento has carried out a study about electrical infraestructures with the objective of placing the wind farm in optimun conditions for explotation. PROJECT/OBJECTIVES:
The project tries to analyze, from an electrical point of view, the different electrical components of the BT, MT network, substation and 132 Kv line of the farm, allowing the stablisment of plans of action, design and maintenance:
PROJECT/METHODOLOGY (PHASES):
The works carried out in this project have been the following ones:
PROJECT/COLLABORATORS:
The carrying out of the study has been in charge of Mr. Juan Rodriguez, with the material contribution of the universities of A Coruña and Vigo. PROJECT/PRESENT SITUATION:
The project has been finished. The possible implementation of the improvements drawn from the conclusions of the report is under consideration. PROJECT/REPORTS CARRIED OUT:
|
|||||
|
|||||